It is hard to believe that it was almost ten years ago I witnessed a CNC router in action for the very first time. I was fascinated and simply had to have one! Although I had been in the creative end of the three dimensional sign business for most of my life I didn't really know what I would do with one of these machines - but I just knew it could do fantastic stuff.

Along with the CNC router I discovered the wonderful material called Precision Board and the glues, primers and other companion products they offer. Since then we have gone through many tons of the material using it in most signs and projects we tackle. This journal will chronicle our many adventures both past, present and future. I'll talk from the perspective of someone who pushes these products to the creative limit on a daily basis. I'll be adding to the stories two or three times each week. -dan

Monday, May 16, 2016

Dubai Viking ship progress

Since my last post showing the Viking ship frame we have made significant progress. The engineer required us to use heavy steel members with plenty of welding. The ship has to withstand lots of moving as we put it together, it travels to the galvanizer and also the long journey to Dubai in the middle east.

To facilitate it's removal from our (rather small) shop at to fit into the galvanizing vats it will break into six sections on each level. The portion that will sit in the water is thirty inches tall. The joining flange is made from eight sections of 3/8" thick plasma cut plate steel. Identical pieces were bolted together to form the seam.



We then began welding up the floor section of the hull. It is essentially a giant truss. We will finish the ship frame to this degree before unbolting the six sections and taking them out of the shop. We will reassemble the piece outside in the parking lot before we build the sides and upper keels of the ship. It will all be test fitted before it gets disassembled once more to go to the galvanizers. When that is done we'll reassemble the hull in two large sections for the concrete sculpture work. Two of these need to be built in the coming weeks.




The other project on the go is the targets. Water cannons on the ship will fire at these pieces. The largest is thirty feet long. We are about half way through tying on the galvanized wire mesh and it is looking pretty cool!