Inside the shop the tree sculpture is done. little more welding was done to the temporary carrier frame to ready it to be fastened to the truck. It will soon be rolled out onto the parking lot in readiness.
The sculpting and painting of the fluttery body was the last thing to get crossed off the list but it too is ready to go. The truck and crane arrive early on Monday morning. It will be fun to watch this load go down the highway as we travel the sixty miles into the city to supervise the installation the same day.